
Jim & Phil leveling the track inside our building.
|

Future pit for working on the underside of the engine.
|

Two 15" gauge tracks are recessed in the floor of our building.
|

Bill, Bob, and Pat building the first interior wall.
|

The walls are going up for the HO train layout room and the
conference room.
|

Bob finishing drywall in the front entrance room (8/13/03).
|