Here are some photos of the dismantling of the Hatton passenger/freight depot in 2005.  Reconstruction and restoration at our Findlay location is planned for 2006, depending on volunteer help and sufficient funding.

 


Bob removing deteriorated slate shingles. (6/4/05)

Dormer removed. (6/11/05)

Ticket window still intact. (6/11/05)

Inside freight side looking toward office. (6/11/05)

Dennis, Wally, and Vicky contemplating beehive in wall.


Roof off.  (7/4/05)


(7/23/05)


Larry, Dennis, and Mike.  (7/23/05)

Dennis (on line truck) with Mike and Bob positioning straps.  (7/23/05)

Larry, Dennis, and Mike laying another wall on the trailer.  (7/23/05)

Mike and Bob as another wall is removed.  (7/23/05)

Wall in mid-air.  (7/23/05)

Removing another wall.  (7/23/05)

Dennis, Bob, Larry, and Al removing inside walls. (8/9/05)

Dennis, Bob, & Mike drilling holes for piers.  (6/10/06)

Vicky, Dennis, Pat & Bob putting in forms.  (6/10/06)
 

Dennis, Bob, Mike & Al pouring concrete piers.  (6/16/06)

Overview.  (6/29/06)

Pat, Norm, Vicky, Al, Bob P. & Wally working on floor deck.  (7/18/06)

Bob, Mike, Vicky, Al & Dennis putting down subfloor.  (7/22/06)
 

Two walls up. (7/29/06)

Inside view.  (7/29/06)

Third wall up.  (8/1/06)